For this project ITP Renewables developed a least-cost generation and associated network development plan for the period of five years (2015 through 2020) with renewable energy plants scheduled to achieve a 50% reduction in imported fuel for electric generation plus a guiding strategy/plan for system development over an additional 10 years (through 2030). The training of counterpart TPL staff and the provision of planning tools and instructions so that the plan may be updated by TPL will be a critically important outcome of the study. It includes: