Yass Council PV feasibility study

A0370-Yass-Feas-Proj-Photo-Wastewater-treatment-plant.jpeg

ITP was engaged by Yass Valley Council to assess the feasibility of installing solar PV, and energy storage at three key buildings in Yass NSW. ITP conducted site visits on the Council works depot, the Wastewater Treatment plant and the Water treatment plant to assess their suitability for solar PV installations.

Based on the load assessment and feasibility analysis, ITP found that grid connected solar PV is feasible, and is recommended at all three sites to offset daytime energy consumption.