Flow Power were in the process of constructing two solar farms in South Australia (5.9 MWp and 3.4 MWp). ITP was engaged by them for third-party due diligence on the designs of those solar farms, and to identify any omissions or errors in the design. ITP conducted a detailed review of the following design packages:
More projects in Engineering