ITP Development is developing 2 x 4.99MW solar farms in Hillston, NSW. ITP Renewables was engaged by them to provide a preliminary (30%) design package, which would then be used as the foundation for the detailed design process.
As part of this process, ITP prepared a Basis of Design which covers the following:
ITP also completed procurement specifications for long lead time items and a design drawing package for the solar farm.