Hillston Solar Farm

Preliminary design and specification

ITP Development is developing 2 x 4.99MW solar farms in Hillston, NSW. ITP Renewables was engaged by them to provide a preliminary (30%) design package, which would then be used as the foundation for the detailed design process.

AdobeStock_234265829_Ishpreet Chawla.jpeg

As part of this process, ITP prepared a Basis of Design which covers the following:

  • Major component selection
  • Site and yield assessment
  • Physical layout
  • Electrical works:
    • Preliminary DC design
    • Preliminary HV design
  • Communications, monitoring and control:
    • SCADA site plan
    • Identifying the requirements of SCADA systems from DNSPs
  • Civil and mechanical works

ITP also completed procurement specifications for long lead time items and a design drawing package for the solar farm.