ITP is engaged as Owner's Engineer for a hybrid energy project in Majuro, Marshall Islands, comprising 3.8MW of PV, 2MWh battery storage, 5MW of new diesel generation, new SCADA and control systems, and upgrades to the existing power station.
A large portion of the allocated solar PV will be installed as a floating system on the reservoirs. A construction contract was awarded in January 2021 and ITP’s role is to review and supervise the construction works to ensure the work is completed to the required quality and performance standards. This includes technical and contractual review of all designs and submittals and regular on-site inspection of construction work.